Photovoltaic Panel High Speed Layup Machine :1、 Function Description
1. Manually place the cell string in the material box, and set up 4 material slots on each side of the PV/Photovoltaic Module/Panel High Speed Layup Machine,
CCD locates the cell string in the XY direction
3. The PV/Photovoltaic Module/Panel High Speed Layup Machine arranges the cell strings according to the set number of strings and positions/electrodes in a regular manner;
4. The model and its parameters can be stored and backed up for later production
5. The device is compatible with 210 and 182 cell string type production
6. The assembly line flows glass into the Automatic Solar Cell string Layup machine, completes typesetting, and automatically flows out
2、 Photovoltaic Module Layup Machine performance description
1. Equipment performance
1) Glass calibration accuracy: ≤± 1mm;
2) Damage rate of cells: ≤ 0.2% (positive grade A cell cells);
3) The Solar Module string layup Machine is fully automated and does not require personnel operation during operation;
4) Placing string accuracy: The front and rear string spacing error is ≤± 0.5 millimeters, and the string spacing is ≤± 0.5 millimeters.
5) Multiple sets of CCDs are used to capture images of size strings
Photovoltaic Panel High Speed Layup Machine :1、 Function Description
1. Manually place the cell string in the material box, and set up 4 material slots on each side of the PV/Photovoltaic Module/Panel High Speed Layup Machine,
CCD locates the cell string in the XY direction
3. The PV/Photovoltaic Module/Panel High Speed Layup Machine arranges the cell strings according to the set number of strings and positions/electrodes in a regular manner;
4. The model and its parameters can be stored and backed up for later production
5. The device is compatible with 210 and 182 cell string type production
6. The assembly line flows glass into the Automatic Solar Cell string Layup machine, completes typesetting, and automatically flows out
2、 Photovoltaic Module Layup Machine performance description
1. Equipment performance
1) Glass calibration accuracy: ≤± 1mm;
2) Damage rate of cells: ≤ 0.2% (positive grade A cell cells);
3) The Solar Module string layup Machine is fully automated and does not require personnel operation during operation;
4) Placing string accuracy: The front and rear string spacing error is ≤± 0.5 millimeters, and the string spacing is ≤± 0.5 millimeters.
5) Multiple sets of CCDs are used to capture images of size strings